Blog
Part O Overheating Assessments: practical compliance using TM59-style modelling
Approved Document O requires designers to assess overheating risk in new homes and conversions. This guide explains how Part O works, when simplified checks are sufficient, and when TM59-style modelling provides the evidence needed for Building Regulations compliance.

Approved Document O has made overheating a core design consideration for new dwellings and qualifying conversions. NHB Architectural Services is dedicated to providing clear, practical guidance that ensures comfortable homes and robust Building Regulations submissions. We combine Cornwall-specific insight with evidence-led modelling so compliance supports real comfort, cost control and buildability.
We see more projects in coastal and exposed Cornish settings where glazing is generous and night ventilation is constrained. These conditions often move a scheme beyond simplified checks and into dynamic thermal modelling. Our role is to identify that early, test sensible options and document a compliant, buildable path that satisfies Building Control.
This article explains how Part O interacts with CIBSE TM59 for homes and TM52 for non-domestic buildings, when simplified checks suffice, when TM59-style modelling is required, and how we translate results into practical design decisions. We also address common questions about what TM59 is, whether it is mandatory and how it differs from TM52.
What Part O requires in practice
Approved Document O addresses overheating risk in homes. It sets out two main compliance routes. The first is a simplified method that limits glazing area relative to floor area, requires effective cross- or single-sided ventilation openings, and relies on practical shading measures. The second route uses dynamic thermal modelling aligned to TM59 principles to demonstrate that defined rooms maintain acceptable operative temperatures for the majority of occupied hours in a design summer year.
For straightforward dwellings with modest glazing, effective purge ventilation and some shading from overhangs or surrounding context, the simplified checks can be sufficient. In Cornwall, many dwellings include large south- or west-facing windows for views, lightweight fabric with limited thermal mass, or security and noise constraints that reduce night-time opening. These characteristics often trigger the modelling route to secure a safe, defensible compliance position.
TM59 for homes, TM52 for non-domestic and how they relate to Part O
TM59 is CIBSE’s methodology for assessing overheating risk in homes using dynamic thermal simulation. It sets criteria for living rooms, kitchens and bedrooms based on hours exceeding comfort thresholds. TM52 is a complementary methodology developed for non-domestic buildings, such as offices, schools and hospitality spaces. TM52 sets three adaptive comfort tests that account for varying internal gains and occupancy patterns typical of commercial environments.
Part O references TM59-style assessment for dwellings because domestic occupancy, internal gains and night ventilation patterns differ from non-domestic use. For non-domestic projects in Cornwall, we typically reference TM52 within planning or client comfort studies, while for Building Regulations Part O we apply TM59-style modelling specifically to homes and qualifying residential conversions. In mixed-use schemes, we align both approaches in one coordinated model so each use class is assessed against the correct comfort framework.
When simplified checks are enough and when to model
We begin with a Cornwall-focused screening of each dwelling. If glazing ratios meet the simplified limits, if cross-ventilation is available, and if external shading or orientation naturally control gains, we document a simplified Part O route with clear drawings and notes for Building Control. When risk factors appear, we advise early TM59-style modelling. Common Cornish triggers include extensive coastal glazing facing south or west, compact town plots with limited cross-ventilation, noise or security issues that prevent safe night opening, bedrooms in loft conversions with roof lights and low thermal mass, and deep-plan apartments with single-aspect layouts.
Dynamic thermal modelling uses an hourly 3D simulation that reflects orientation, shading, envelope build-ups, ventilation strategy and local weather files. We calibrate window opening schedules, purge ventilation rates and occupant patterns to mirror realistic behaviour. The outcome is a room-by-room assessment against TM59 criteria that shows pass or fail, highlights peak conditions and quantifies the benefit of mitigation options.
What our overheating assessments deliver
NHB Architectural Services is committed to delivering clear, actionable outputs. Our Part O and TM59-style packages typically include a calibrated 3D model of the dwelling, a summary of inputs and assumptions aligned with design drawings, room-by-room results against TM59 criteria, sensitivity tests for feasible mitigations, and an evidence-led recommendation set balancing comfort, cost and buildability. Where helpful, we include optional future-climate scenarios so clients understand resilience.
We liaise directly with Building Control or Approved Inspectors. We present the logic of the chosen route, justify assumptions and provide drawing annotations that lock in the agreed strategy. This approach reduces rework and aligns trade packages early. For clients progressing to detailed design, we integrate findings with our building regulations drawings so the ventilation, shading and glazing details are coordinated from the outset. If you are preparing a Building Regulations submission, our dedicated page on building regulations compliance outlines how we manage the process end to end, including Part O coordination.
Typical mitigation strategies that work in Cornwall
We focus on measures that secure compliance without compromising the architectural intent. Practical options include moderating west-facing glazing where evening gains are most challenging, adding external shading such as modest overhangs or well-positioned fins, specifying solar-control glass with balanced visible light transmittance, designing for safe night ventilation with secure openings and clear purge routes, increasing internal thermal mass where suitable, for example using dense internal linings, and planning for future-ready additions, such as easy-to-fit external blinds or films, where clients prefer to stage investment.
We test these options in the model to quantify impact. The selected package is captured in drawings and notes so contractors understand intent and Building Control sees a coherent strategy.
Local context and common questions
Cornwall’s microclimates matter. Coastal exposure increases solar gain and wind-driven infiltration but can still leave bedrooms hot on calm summer nights if openings are restricted. Rural settings may enjoy cross-ventilation but often rely on large panes for views. Town sites can face acoustic and security limits that reduce night opening. Our screening and modelling reflect these conditions and provide proportionate responses.
NHB Architectural Services also supports planning and design coordination. When proposals adjust glazing or shading for Part O, we integrate those refinements within planning drawings to maintain design coherence. Our team is experienced in aligning compliance with visual quality, and our property visualisation service can illustrate how shading and overhangs read within the elevation.
Overheating Assessment FAQs
What is an overheating assessment?
An overheating assessment evaluates whether a dwelling is likely to become uncomfortably hot during warm periods. Under Part O this can be done using simplified checks for glazing, ventilation and shading or through dynamic thermal modelling that simulates indoor temperatures hour by hour.
What is TM59 overheating?
TM59 is a CIBSE methodology for assessing overheating risk in homes using dynamic simulation. It sets pass criteria based on the number of hours rooms exceed adaptive comfort thresholds during a typical summer scenario.
Is TM59 mandatory?
TM59 itself is not a law, but Part O often expects TM59-style dynamic modelling where the simplified method is not sufficient. In many Cornwall projects with large glazing or limited night ventilation, TM59-style modelling becomes the practical route to demonstrate compliance.
What is the difference between TM59 and TM52?
TM59 applies to homes and uses domestic occupancy and comfort criteria. TM52 applies to non-domestic buildings and uses three adaptive comfort tests suited to commercial patterns of use. For Part O in dwellings, we use TM59-style modelling; for non-domestic comfort studies we reference TM52.
How we work with your project team
NHB Architectural Services begins with a free initial consultation and a site-focused discussion. We review drawings, identify likely risk factors, and agree the appropriate route. If dynamic modelling is required, we confirm inputs, run the baseline, iterate sensible mitigations and document the chosen solution. We coordinate with planners when glazing or shading adjustments affect elevations and with Building Control to agree assumptions early.
For clients seeking a single point of contact across drawings and compliance, our building regulation services detail how we manage Full Plans submissions and liaison through to completion. If a scheme would benefit from clear visuals to communicate shading strategies or overhangs, our architectural visualisation capability can support both design decisions and stakeholder engagement.
Summary and next steps
Part O asks for evidence that homes will remain comfortable in warm weather. In Cornwall, coastal glazing, evening sun and night ventilation limits often mean simplified checks alone are not enough. TM59-style dynamic modelling provides a robust, defensible route that balances comfort, cost and buildability. NHB Architectural Services delivers clear models, practical mitigation advice and coordinated submissions that streamline approval.
If you are planning a dwelling or conversion and want an early read on overheating risk, arrange an initial consultation. Explore how we approach an overheating assessment on our service page for overheating analysis in Cornwall, or learn how we manage wider compliance on our page covering building regulations in Cornwall. We are committed to evidence-led, locally informed solutions that make homes comfortable and compliant.