A New Energy Efficient Office Building in Carnon Downs
We designed a modern, energy efficient replacement office building in Carnon Downs, Cornwall, taking the project from planning application through to building regulations. The result is an accessible, Part M compliant office with a staff room, showers, a meeting room and solar panels for a growing business.

Planning a new office or commercial building in Cornwall?
Outgrowing an old office, and planning something better
Our client had been running their business from a site off Old Carnon Hill, near Carnon Downs, for years, working out of a modest single storey office building. As the team grew, the space no longer matched the way they worked. They came to us wanting a proper, permanent office: somewhere energy efficient, accessible to everyone, and big enough to give staff the facilities they deserved.
The brief was clear and practical. We needed to design a modern office building with a staff room, toilets, showers and a dedicated meeting room, fully compliant with Part M accessibility standards so the building would welcome every member of staff and every visitor. It also had to work hard for the business day to day, without losing the site’s rural Cornish setting.
From planning application to building regulations approval
We started by preparing planning drawings for the new office and submitting the application on the client’s behalf, drawing on our understanding of Cornwall’s planning process to keep things moving smoothly. Once permission was secured, we moved into building regulation drawings, working through the detail needed to get the design ready for construction.
Throughout, we worked alongside the client’s chosen build team, including Vespa Development as main contractor and JHA Consulting on structural engineering, to make sure the drawings translated into a buildable, practical scheme. Keeping everyone aligned from planning through to building regulations meant the project could progress with confidence at every stage, right through to completion in August 2025.
Designing a modern, accessible office from the ground up
The new building replaced the old single storey office with a two-storey, purpose designed workspace. Downstairs, we planned a welcoming reception, a locker room for staff, storage and a meeting space where the team and visitors can sit down together. Upstairs, an open plan office area sits alongside a kitchen, staff toilets and further storage, giving the business proper room to operate.
Accessibility was built in from the start, with the layout designed to meet Part M requirements throughout. We specified a durable, low maintenance exterior of painted render and slate tile cladding under a slate roof, and the finished building includes roof mounted solar panels, helping keep the energy efficiency the client asked for built into daily running costs.
A bright, efficient new base the team can rely on
The finished office building gives the business a genuinely fit for purpose home, a world away from the portable cabin it replaced. With its staff room, showers, accessible toilets and dedicated meeting room, the team finally has the facilities to match how they work. Solar panels help manage running costs, and the accessible, Part M compliant design means the building welcomes everyone who visits or works there.
Set within the same established site off Old Carnon Hill, the new building gives the business a permanent, professional base in Carnon Downs for years to come, built around an investment of around £450,000. It’s a project we’re proud to add to our commercial architecture work across Cornwall.