A first floor extension for a Newquay home that respects its neighbours
A first-floor extension, balcony, decking and entrance porch for a Newquay home, designed with a shallow hipped roof to protect neighbours' light and views. Three planning applications and two appeals later, the project completed in September 2024, guided by us from sketch to finished build.

Thinking about a first-floor extension of your own?
A bungalow with big potential on a site that needed a careful approach
Our clients came to us in 2018 with a clear ambition: turn their single storey home into a modern two storey property, with a first-floor extension, new balcony, decking and entrance porch. The existing bungalow sat slightly forward of its neighbours on a tightly packed stretch of the Newquay coastline, which meant any addition to its height had the potential to raise genuine concerns about loss of light and overlooking for the properties around it. Our brief was to design a first floor that gave our clients the extra space and sea views they wanted, while properly respecting the outlook and daylight of the homes nearby. Getting the design right from the outset mattered, because we knew this site would need a persuasive planning case, not just a good idea. It is exactly the kind of challenge our residential architecture team enjoys getting right.
Three applications, a pre-application chat and two appeals, we stayed the course
Getting to yes on this site was not straightforward. Between 2018 and 2024 we submitted three separate planning applications, held a pre-application discussion with the local planning team, and took two decisions to appeal when the council’s objections did not reflect what the design actually delivered on the ground. Each round gave us more detail about exactly which concerns needed addressing, and we used that feedback to refine the proposal rather than start again from scratch. Cornwall Council’s own guidance on the planning appeals process is worth a read if you are weighing up a similar route. Throughout, we kept our clients informed at every stage, so a long process never felt like it was happening to them.
A shallow hipped roof and considered detailing that answered every objection
We led the project from first sketch through to completion, handling the design, the planning and design process, and the building regulations drawings needed to get the extension built. The key design move was a deliberately shallow hipped roof, which let us add a full first floor without pushing the ridge height up to a point that would have given neighbours genuine grounds to object on loss of light or overlooking. We specified sand and cement render with timber boarding and aluminium windows and doors to modernise the elevations, and added a new balcony, decking and entrance porch so the finished home made the most of its coastal position, inside and out.
A home transformed, with permission secured for good
The result is a first-floor extension that gives our clients the extra bedrooms, living space and sea views they set out for, built on a design that ultimately satisfied the council and the neighbours it needed to convince. The project completed in September 2024, six years after that first conversation, proof that a well considered design and a willingness to see the planning process through can turn even a difficult site into a real family home. It is a project we are proud to have stayed with from the very first sketch to the finished build.